Anviz EP300 Basic Guide (Applicable to W1 Pro): Set Work Shifts

To read the full guide with pictures, click here: Anviz EP300 Basic Guide

 

  1. On the Main screen press 6 (or use the Left/IN and OUT/Right to navigate to Advanced and press OK).

 

  1. On the Advanced screen, press 6 (or use the Left/IN and OUT/Right to navigate to Shifts and press OK).

 

  1. You may navigate the interface with the Left/IN and OUT/Right buttons.

 

  1. For each shift, you may set the start and end times. The first time on each row is the start time and the second time on each row is the end time.

 

  1. Navigate to Save and press OK to save changes.

 

  1. You may press M/Back to leave the Shifts screen.